In the Sanchursky district, repairs have begun on the bridge over the Mamoksha River.
The total length of the bridge is 29.91 linear meters. The repair is being carried out as part of the national project "Infrastructure for Life." As noted by the acting Minister of Transport of the Kirov Region, Artyom Drachkov, the facility is included in the federal program, as it provides constant communication for residents of remote villages, freight transit, and access to socially significant routes. We remind you that last week, on May 5, the Ministry of Transport reported the partial restoration of traffic on the bridge over the Luza River in Lalsk — two weeks after the crossing was closed due to flooding.
Другие Новости Кирова (НЗК)
In the Sanchursky district, repairs have begun on the bridge over the Mamoksha River.
On the Yaransk - Sanchursk - Republic of Mari El border route, work has begun on updating the crossing.
