Details of the construction of the pool in Slobodskoy have become known.
According to sources, the decision to start work without an advance payment is related to the risks of delays: there have already been cases in the region of funding being delayed for similar projects. In the current project, the contractor, despite possible funding delays, has chosen an accelerated implementation mode.
According to the project documentation, the total area of the future complex will be about 4,700 square meters. The main pool will be 25 meters long and designed for six lanes. The depth will range from 1.2 to 1.8 meters. A small pool with a depth of 0.8 meters is also planned for children's training.
The facility will include a gym, a medical office, and stands for 50 spectators. The construction is being carried out as part of a state program, with completion scheduled for 2027.
At the same time, the construction organization is involved in the implementation of other projects in the region. In particular, this includes the construction of a school in Kotel'nich, designed for 461 students. The project was previously transferred to another developer; however, the contract was terminated, after which the work was handed over to a new company.
Additionally, according to previously published information, the contractor is participating in the implementation of an industrial project outside of Russia—in South America. Contract details are not disclosed.
In Kirov, the company is also acting as the contractor for the reconstruction of the Feodorov Church on the Green Embankment. The stone church is being built on the site of a lost wooden building; the groundbreaking took place in May 2025.
"For us, it is fundamentally important not just to build, but to create facilities that will serve people for decades. The pool in Slobodskoy is not only about sports but also health and leisure for hundreds of families. I believe that even the most complex project can be brought to fruition if approached responsibly. We are grateful for the trust and guarantee quality and adherence to deadlines—whether it is a pool in the Kirov region or an industrial site in South America," noted Vadim Fedotov, a representative of the construction organization.
Другие Новости Кирова (НЗК)
Details of the construction of the pool in Slobodskoy have become known.
In Slobodskoy, work has begun on the construction of a new swimming pool. A contract with the contracting organization represented by the construction company "ROST" was signed in March 2026, and already the next day after its signing, the company started preparatory work, without waiting for the advance payment.
