
They will peel off the asphalt from the Pizhma bridge.
Asphalt will be stripped from the bridge over Pizhma River
Yesterday, 20:01 | Reporter11087
Print
From the night of July 10 to 11, the contractor will commence milling the worn pavement on the bridge over the Pizhma River in the Soviet district.
Photo: vk.com/mintrans_43
The regional Ministry of Transport reported that asphalt on the bridge over the Pizhma River is being replaced. The contractor, JSC Viyatavtodor, will begin milling the worn surface during the night of July 10 to 11.
According to the department, the work will be carried out at night to avoid disrupting traffic on the bridge. After the workers remove the old asphalt coating, the laying of a new asphalt layer will begin.
The completion date for repairs to the bridge over Pizhma in the Soviet district has not been clarified by the regional Ministry of Transport.
Другие Новости Кирова (НЗК)






They will peel off the asphalt from the Pizhma bridge.
On the night of July 10 to 11, the contractor will begin milling the worn-out pavement on the bridge over the Pizhma River in the Soviet district.