
The sand deposit development project was sent for revision
A meeting was held at the Ministry of Environmental Protection to review the project for the development of a deposit of construction sand and sand-gravel mixture "Suspicion-5". The participants of the meeting came to the conclusion that the project needs to be finalized.
The Ministry's experts analyzed the compliance of the project documentation with the conclusion of the state expertise and the requirements of the legislation. During the inspection, inconsistencies were identified that must be eliminated by the subsurface user. The company's representatives were given recommendations on how to bring the project in line with the standards. After making the necessary changes, the draft can be resubmitted for approval.
Другие Новости Кирова (НЗК)






The sand deposit development project was sent for revision
The Ministry of Environmental Protection has checked the compliance of the documentation with the necessary requirements.