In Slobodskoy, preparations have begun for the construction of a swimming pool.
In Slobodskoy, preparations have begun for the construction site for the swimming pool. It will be located on Grin Street, not far from the new children's clinic. Currently, the contractor is clearing the area of vegetation, working on drainage, and leveling the surface.
It should be noted that the project has already passed state expertise. It includes the creation of a large pool with six lanes, with a depth of 1.2-1.8 meters, a small pool with a depth of 0.8 meters, as well as a gym and stands for 50 seats. Both pools will be of the overflow type, the government reported.
Другие Новости Кирова (НЗК)
In Slobodskoy, preparations have begun for the construction of a swimming pool.
It will be located on Green Street.
